Experience since 1980 in project design, construction, and maintenance of enterprises
Experience since 1980 in project design, construction, and maintenance of enterprises

Maintenance of systems and equipment involved in the production and administrative buildings using predictive techniques for performance analysis of each machine stops planning in accordance with the industry production systems, cost reduction plan and preparation of CAPEX and OPEX for implementation of improvements within the facility.
Maintenance five industries with a total area of 2,650,000 square meters involving a major power substation with 100 MVA, 138 kV / 13.8 kV, administrative buildings with total area of 414,000 square meters, 18 production lines, utilities center with two turbines steam and four air compressors with 12 ton per hour capacity, 38 reinforced substation (SF6), one wastewater treatment plant with 12 m3 / h capacity, data center with an area of 280 square meters, lighting, systems drainage.
Maintenance of an industrial plant with 487,000 square meters, the main power substation with power of 160 MVA – 138 kV / 13.8 kV interconnected with 28 secondary substations, utilities center with generators and gas turbines, three electric chillers 1500 TR, wastewater treatment plant, potable water system, electrostatic filters, two boilers with 9 meters cubic power of 70 KW each, demineralization unit of water.