Commissioning

Commissioning systems and support phases of ramp up for production

Expansion of a plant with new facilities to increase production. This plant was necessary new power generating equipment, utility systems and communications networks for the production servers. Commissioning phases were divided according to customer’s production priorities and adapted to the P & ID process flowchart has been designed.

Technical Summary

Facilities to increase production in sector painting and assembly body

Design, planning and electromechanical assembly of the network to demineralized water with reverse osmosis system, 132 tons of stainless steel collectors, 4200 I / O for instrument control in the process, emergency lighting, water system with 1230 valves and filters, 650 meters of busway 5000 Amperes, 6 substations of 13.8 kV – 5 MVA each, network for managing energy EPMS / IEC 61850 integrated with selectivity and electrical system protections, 45200 meters of compressed air piping, utilities station with 6 turbo centrifugal compressor full gear 47000 m3 / h -3500 kW with 8 stages, 4 tanks for offsetting with 80 cubic meters, air refrigeration dryer, pumps industrial water system for welding cooling, integrated Digital Control system, 38 robots axial welding, commissioning and tryout.

Piping to process, industrial automation, metal structure, power systems

Design and construction of factory for auto parts involving utilities with pipe from 6″ to 22″, electric substation 88kV 50MVA with 4 transformers – 13.8 kV, 2 lines of presses of 1600 tons each, 880 tons platforms in metal structures, panels control, variable speed drives, mechanical and electrical infrastructure, two generators in sync 3,500 kVA, medium voltage panels, lightning protection system, CCTV.